| 1 |
373_Eppawala |
PRAJA/./12/./373/./PE/./30 |
Construction of a bathing place for natural parks near the Eppawala Phosphate bridge, being developed as a tourist destination for local and foreign tourists. |
1,900,000.00 |
1,843,000.00 |
| 2 |
374_Kadigawa |
PRAJA/./12/./374/./PE/./6 |
Starting a garment/sewing industry project for Pradeepa Diriya Women's Society. |
1,500,000.00 |
1,455,000.00 |
| 3 |
375 Kiriamunukole |
PRAJA/./12/./375/./FS/./4 |
Construction of a threshing floor (Kamatha) for 401/D 7/8 Farmers' Organization. |
1,900,000.00 |
1,843,000.00 |
| 4 |
376 Nallamudawa |
PRAJA/./12/./376/./PE/./25 |
Renovation of the unsafe spillway of Thimbiriwewa Tank. |
1,400,000.00 |
1,358,000.00 |
| 5 |
377 Mawathawewa |
PRAJA/./12/./377/./SC/./5 |
Renovation of the dilapidated spillway on Rotawewa Andarayaya agricultural road. |
1,000,000.00 |
970,000.00 |
| 6 |
379 Keledivulwewa |
PRAJA/./12/./379/./PE/./15 |
Construction of a threshing floor for Parakrama Farmers' Organization representing Keledivulwewa and Ihalagama Galmaduwa divisions. |
1,900,000.00 |
1,843,000.00 |
| 7 |
381_Medagama |
PRAJA/./12/./381/./PE/./14 |
Renovation of the spillway of Medagama Tank. |
1,900,000.00 |
1,843,000.00 |
| 8 |
383_Katiyawa Yaya 06 |
PRAJA/./12/./383/./PE/./16 |
Preparing the end portion of Katiyawa Tank and implementing a cage fish farming project through a registered society. |
1,400,000.00 |
1,358,000.00 |
| 9 |
384_Katiyawa Yaya 09 |
PRAJA/./12/./384/./FS/./12 |
Starting a greenhouse vegetable cultivation project by establishing a society. |
1,900,000.00 |
1,843,000.00 |
| 10 |
385_Katiyawa Yaya 10 |
PRAJA/./12/./385/./FS/./11 |
Construction of a threshing floor for Viharamahadevi Farmers' Organization. |
1,900,000.00 |
1,843,000.00 |
| 11 |
387 Katiyawa Yaya 02 |
PRAJA/./12/./387/./FS/./8 |
Construction of a threshing floor for Suwasetha Farmers' Organization. |
1,900,000.00 |
1,843,000.00 |
| 12 |
388_Eliyadivulwewa |
PRAJA/./12/./388/./PE/./31 |
Providing a water filter to Eliyadivulwewa, Thimimagama village. |
1,400,000.00 |
1,358,000.00 |
| 13 |
389_Kandurugaswewa |
PRAJA/./12/./389/./SC/./27 |
Development of side walls on both sides of the culvert damaged by Cyclone Ditwah in Kandurugaswewa, Koralayagama. |
1,720,000.00 |
1,668,400.00 |
| 14 |
390 Ihalasiyambalewa |
PRAJA/./12/./390/./PE/./24 |
Starting an earthworm compost fertilizer production project proposed by Yodhaelagama Swashakthi Village Development Society. |
1,500,000.00 |
1,455,000.00 |
| 15 |
391_Palugaswewa |
PRAJA/./12/./391/./PE/./32 |
Provision of a drinking water filter for Palugaswewa village. |
1,500,000.00 |
1,455,000.00 |
| 16 |
392_Madiyawa |
PRAJA/./12/./392/./PE/./7 |
Removing moss/silt and renovating the tank near the entrance road to Madiyawa village, and providing facilities for fish farming. |
1,500,000.00 |
1,455,000.00 |
| 17 |
393_Andagala |
PRAJA/./12/./393/./PE/./13 |
Establishing a society and renovating the closed preschool building near the playground in 393 Andagala division to establish a garment industry for Andagala, Katiyawa Yaya 01, and Kelesiyambalewa divisions. |
4,500,000.00 |
4,365,000.00 |
| 18 |
394_Galwaduwagama |
PRAJA/./12/./394/./FS/./9 |
Construction of a threshing floor on the land of Galwaduwagama Mahaweli official quarters for 402/D5 Pahala Gajaba Farmers' Organization. |
1,900,000.00 |
1,843,000.00 |
| 19 |
396 Rajjallegama |
PRAJA/./12/./396/./PE/./23 |
Construction of side wall of the canal near Mr. Ranbanda's house on the 402/D11 distribution canal road in Hurigaswewa village, 396 Rajjallegama division. |
1,500,000.00 |
- |
| 20 |
397 Adhiranigama |
PRAJA/./12/./397/./PE/./10 |
Construction of a Milk Collection Center. |
1,900,000.00 |
1,843,000.00 |
| 21 |
398-Kiralogama |
PRAJA/./12/./398/./PE/./29 |
Renovation of the agricultural road from Karamba farmland to Kiralogama cemetery to provide infrastructure for vegetable and fruit transport. |
1,900,000.00 |
1,843,000.00 |
| 22 |
399-Ketakala |
PRAJA/./12/./399/./PE/./28 |
Construction of a threshing floor for 403/D2 Samadhi Farmers' Organization in 399-Ketakala division. |
1,500,000.00 |
1,455,000.00 |
| 23 |
400_Meegassegama |
PRAJA/./12/./400/./PE/./26 |
Construction of a threshing floor for D 5 Canal Farmers' Organization in 400 Meegassegama division. |
1,900,000.00 |
1,843,000.00 |
| 24 |
401_Hinguruwewa |
PRAJA/./12/./401/./PE/./20 |
Renovation of Acharigama spill canal (40 meters). |
1,400,000.00 |
1,358,000.00 |
| 25 |
402_Korakahawewa |
PRAJA/./12/./402/./PE/./21 |
Construction of a threshing floor for Bindunkada Farmers' Organization in Korakahawewa division. |
1,900,000.00 |
1,843,000.00 |
| 26 |
403 Kurunduwewa |
PRAJA/./12/./403/./PE/./22 |
Removing aquatic plants from Kurunduwewa and initiating a water lily and fish farming project for Ekamuthu Youth Club. |
1,900,000.00 |
1,843,000.00 |
| 27 |
404- Ihala Thalawa |
PRAJA/./12/./405/./PE/./17 |
Graveling and renovating the side roads of the agricultural road running through the paddy tract belonging to 421 Ihalathalawewa Farmers' Organization. |
1,900,000.00 |
- |
| 28 |
404- Ihala Thalawa |
PRAJA/./12/./405/./PE/./33 |
Development of FC33 field canal using concrete (Concrete canaling). |
1,100,000.00 |
1,067,000.00 |
| 29 |
406_Karagahawewa |
PRAJA/./12/./406/./PE/./3 |
Establishing a society and providing necessary equipment to promote the sewing industry. |
1,400,000.00 |
1,358,000.00 |
| 30 |
407_Pahala Thalawa |
PRAJA/./12/./407/./FS/./2 |
Widening the problematic spill canal of Idigaspothana Tank and preparing the embankment. |
1,400,000.00 |
1,358,000.00 |
| 31 |
408_Daladapura |
PRAJA/./12/./408/./PE/./1 |
Establishing a society and providing necessary equipment to promote the sewing industry. |
1,500,000.00 |
1,455,000.00 |
| 32 |
409- New Hanguranketha |
PRAJA/./13/./409/./PE/./34 |
Establishing a society and providing necessary equipment to promote the sewing industry. |
1,500,000.00 |
- |
| 33 |
410_Kumbukgahawewa |
PRAJA/./12/./410/./PE/./18 |
Providing a paddy transplanter machine for 420 S.D. 1.2 Farmers' Organization. |
1,400,000.00 |
1,358,000.00 |
| 34 |
411_Hirigollegama |
PRAJA/./12/./411/./FS/./19 |
Establishing a society in 411-Hirigollegama division, developing Kumaraeliya Pond, and starting a water lily cultivation project. |
1,500,000.00 |
1,455,000.00 |
| Total |
|
|
|
58,220,000.00 |
51,720,400.00 |